Completion of 36 Storeys Way, Churchill College, Cambridge

Construction of three new postgraduate houses as part of an overall masterplan to consolidate a graduate ‘campus within a campus’ for the College, completed in May 2019.
The scheme used a 2 stage tender process and the input from the Main Contractor and his sub-contractors proved to be invaluable in the overall design of some of the more complicated aspects of the building.
The Architects have embraced the local area including the Arts and Crafts character of Storey’s Way and continued the theme with handmade hanging tiles on the elevation along with timber boarding, pre-cast concrete panels with a copper roof with decorative copper flashings.
The college accommodation is split between three new houses, including 30 en-suite student rooms, 6 communal kitchens, 5 self-contained flats and associated support spaces.
Photovoltaics were installed on the roof and an air source heat pumps was installed part of the M&E installations.
A landscaping scheme was also developed with the College’s gardener.

Client: Churchill College, Cambridge
Contractor: Barnes Construction
Architect: Cottrell & Vermeulen
Quantity Surveyors: Robert Lombardelli Partnership
M&E Consultants: OR Consulting
Structural Engineer: engineersHRW